Installing Principle Valve Boxes

Construction
1_htm_m74d6e432

  1. Fill area below the valve box and inside the valve box with gravel. This will help with drainage and future maintenance of the valve.
1_htm_m675fab97

  1. Place the lid on the valve box and backfill the work area. The area should be backfilled with dirt only. Rocks should be removed.
1_htm_1a9a997a
  1. This is the finished valve box. The lid is bolted to the box to deter vandalism.