Less than 1 hour for installation
Materials List
Qty | Item | Notes |
1 | Valve | Dependent on size of tube at valve location |
1 | Cloth rag | For cleaning before gluing |
1 | Can of PVC glue |
Construction
Installing the valves are pretty straightforward. Cut into the tubes and install as needed. This picture can be used as a guide. This setup allows for the system to be shutoff and the cleanout opened so that the entire flow is redirected out the cleanout valve. Cleanout valves can also be installed without a corresponding shutoff valve.
Installing the valves are pretty straightforward. Cut into the tubes and install as needed. This picture can be used as a guide. This setup allows for the system to be shutoff and the cleanout opened so that the entire flow is redirected out the cleanout valve. Cleanout valves can also be installed without a corresponding shutoff valve.
No comments:
Post a Comment